51³Ô¹ÏÍø

Construction of the Elbe Lateral Canal in 1975

BAD BEVENSEN, LOWER-SAXONY, GERMANY - 1975: The video captures the 1975 construction of the Elbe-Seitenkanal in Bad Bevensen. Heavy machinery like excavators and trucks are shown dredging the waterway. The 115-kilometer canal, connecting Calberlah to Artlenburg, serves as a vital water route in Lower Saxony, managed by the Wasserstraßen- und Schifffahrtsamt Mittellandkanal/Elbe-Seitenkanal.
BAD BEVENSEN, LOWER-SAXONY, GERMANY - 1975: The video captures the 1975 construction of the Elbe-Seitenkanal in Bad Bevensen. Heavy machinery like excavators and trucks are shown dredging the waterway. The 115-kilometer canal, connecting Calberlah to Artlenburg, serves as a vital water route in Lower Saxony, managed by the Wasserstraßen- und Schifffahrtsamt Mittellandkanal/Elbe-Seitenkanal.
PURCHASE A LICENSE

Get personalized pricing by telling us when, where, and how you want to use this asset.

DETAILS

Credit:
Editorial #:
2017889729
Collection:
Archive Films: Editorial
Date created:
January 01, 1975
Upload date:
License type:
Rights-ready
Release info:
Not released.ÌýMore information
Clip length:
00:03:19:14
Location:
Bad Bevensen, Lower-Saxony, Germany
Mastered to:
QuickTime 10-bit ProRes 422 Standard HD 1920x1080 25p
Originally shot on:
Super 8 OCN 15p
Source:
Archive Films Editorial
Object name:
f030_elbe_seiten_kanal_1975_hd_prores422